Woollahra Council exhibited a draft amendment to the Woollahra Development Control Plan 2015 (Woollahra DCP 2015).

The Draft Woollahra DCP 2015 (Amendment No. 18) seeks to update and strengthen the existing objectives and controls to:

  • minimise the impacts of groundwater drawdown as a consequence of underground structures, and
  • ensure there are no adverse hydrogeological impacts on any surrounding properties and infrastructure, both during and after construction.

The draft DCP applies to the entire Woollahra local government area. It amends the following chapters of the Woollahra DCP 2015.

  • Chapter A1: Introduction
  • Chapter D5: Double Bay Centre
  • Chapter E2: Stormwater and Flood Risk Management

Supporting technical documents prepared by GHD engineering consultants provide detailed hydrogeological and geotechnical assessments which informed the preparation of the draft DCP.


Thank you to everyone that participated and made a submission. The exhibition is now closed, but you can still read the exhibition documents on this page.

The public exhibition was open from Wednesday 30 June 2021 to Friday 13 August 2021.

Woollahra Council exhibited a draft amendment to the Woollahra Development Control Plan 2015 (Woollahra DCP 2015).

The Draft Woollahra DCP 2015 (Amendment No. 18) seeks to update and strengthen the existing objectives and controls to:

  • minimise the impacts of groundwater drawdown as a consequence of underground structures, and
  • ensure there are no adverse hydrogeological impacts on any surrounding properties and infrastructure, both during and after construction.

The draft DCP applies to the entire Woollahra local government area. It amends the following chapters of the Woollahra DCP 2015.

  • Chapter A1: Introduction
  • Chapter D5: Double Bay Centre
  • Chapter E2: Stormwater and Flood Risk Management

Supporting technical documents prepared by GHD engineering consultants provide detailed hydrogeological and geotechnical assessments which informed the preparation of the draft DCP.


Thank you to everyone that participated and made a submission. The exhibition is now closed, but you can still read the exhibition documents on this page.

The public exhibition was open from Wednesday 30 June 2021 to Friday 13 August 2021.

  • CLOSED: This survey has concluded.

    You can make a submission to the draft Woollahra DCP 2015 (Amendment No. 18) using Your Say Woollahra.

    Complete Form
    Share on Facebook Share on Twitter Share on Linkedin Email this link